Services network



Services network

The site is connected to the distribution system of power supply, water mains, non-potable water, drains, steam pipeline, gas supply and the telephone network.



Power supply

The power supply is brought to the site by the 22 kV underground cables, laid directly to the actual transformer substations, which comprise altogether 8 transformers in the range of approx. 1000 - 1600 kVA. The power supplies are distributed from the transformer substations to the individual objects.



Water mains and drains

Water mains and service water connections are distributed to the individual objects. The drains consist of a single-pipe system, also referred to as the plant drains, and terminate in the public service drains.



Steam pipeline

The steam pipeline routes steam to exchangers to heat the objects. There is also a gas boiler plant on the site.